ID : 866
The Basic Procedure of Overhead-mounting
1
When unpacked, the robot unit is as shown below:

2
Mount suspension jigs A and B using hexagon socket head bolts and plain washers.



3
Drive the hoisting (that come with the robot unit) into the suspension jigs.
4
Pass a belt sling through each hoisting bolt, and put their eyes on the hook.

5
Hoist the robot unit using a crane and move it to the position right above the suspension jig C.

ID : 866

