ID : 6294
Backup of Projects
Back up project data periodically in WINCAPSIII in order to recover the robot controller smoothly after loss of project data due to unexpected accidents such as expired service life of memory backup batteries.
Be sure to back up project data and preserve it, in particular:
- at the time of purchase
- after performing CALSET
- after changing RANG values
- after replacement of a motor
- after updating robot controller data.
Arm data refers to CALSET and RANG values in project data, which is unique to individual robots and determines the position of each axis.
ID : 6294