<< Prev        Next >>

ID : 11048

Cabling procedure

Each I/O cable connects to the applicable connector inside of the MC9 series controller. To connect them, you need to open the upper panel of the MC9 series controller beforehand.

The following shows the overall procedure of each I/O cable connection. For details about each process, refer to the following linked pages.

Step / To do / Link
1

Open the upper panel.

--> How to open the upper panel

2

Pull out cables from the cable multi-outlet plate. Connect each I/O cable to the applicable connector in the MC9 series controller.

-->How to pull out cables

3

Close the upper panel.

--> How to close the upper panel

ID : 11048

<< Prev        Next >>