<< Prev        Next >>

ID : 2448

Reference Drawings for Stays that Clamp Wiring and Piping

When mounting a stay that clamps wiring and piping to the robot unit, fix the stay with the two existing screw holes that are located on the arm connector plate of the second axis.
Referring to the drawing given below, set up a stay.

Maintenance and inspection of the robot unit sometimes requires removing and installing the covers. Mount the stay for wiring and piping so that it will not interfere with removal/installation of the covers.

Positions of existing screws for stay

Reference drawing for a stay

 

ID : 2448

<< Prev        Next >>